Each process has inputs and outputs, i.e., it is necessary to prepare relevant documents to guide the production of the corresponding process, such as the wire down table to guide the wire down crimping process.
Note: the wiring table is the wiring, crimping details, including a variety of process parameters and requirements, such as process forms. In the wire harness production process, the down wire table ultimately through the down wire crimping process card, used to guide the operation of the down wire crimping process, to guide the workshop production process.
Each process also needs to be inspected, and only after the inspection is passed can the batch be carried out, and the process needs to be monitored at any time. For example, in the wire down process, you need to make the first piece, the first piece of wire length, stripping head and other parameters through the inspection, before the batch can be down the line.
Downstream (material) process
Definition: The so-called down the line is based on the design drawings, the different specifications of the wire conductor according to the process of cutting, stripping, bundling process.
Process: prepare materials → adjust equipment → first piece of inspection (measuring wire length, stripping head) → mass production (in the final inspection, 100% self-inspection) → finishing wire → to be turned over.
Inspection: The wire length, full stripping and half stripping length, opening length and other process parameters need to be measured in the wire down process.
Crimping process
Definition: The so-called crimping is the process of wire and terminal role together.
Process: prepare materials → adjust the equipment → do the first piece → the first piece of inspection (micrometer to measure the height of the crimp, crimp width) → mass production (in the end of the inspection 100% self-check crimp quality) → to be turnover
Inspection: The crimping process requires measurement of process parameters such as whether there is R angle, whether the visible range of the core wire and insulation skin is within the tolerance range, whether there is any damage to the pressing part of the core wire and the pressing part of the insulation skin and the degree of distortion of the crimp.
Split assembly (pre-assembly) process
Definition: The so-called pre-assembly is the process of assembling the semi-finished products with sheaths, tubes, rubber parts and other components into new semi-finished products after wire or crimping.
Process: Prepare materials → one plug, two listen to three pull back → installation of self-locking
Inspection: According to the process of one insertion, two listening and three pulling back to complete the self-inspection.
Assembly (general assembly) process

The so-called assembly is the process of combining the semi-finished products after wiring or crimping, semi-finished products after pre-installation and other materials into a finished wire harness. Tape or zip ties are bundled into a bundle, which is a wire harness.